We started the display for the inside of the store and it is almost ready to install. It is moving a lot quicker than expected, which is good considering the snow storm that is on its way. So far this week I've been doing some smaller jobs. I did signage for two separate areas (one for the front of the store and the other for the dressing room). I'll post pictures later this week possibly. I've also been shellacing a lot for the display. We also got to present our sketches for one of the concepts to our bosses today. We all agreed it was difficult to put on paper what was going on in our heads. It ended up being a big brainstorm that will be sketched up tonight. Hopefully we helped out a little!